Technology of replacing oil and gas wellhead gate valve under pressure

Technology Introduction

This technology has been applied on-site for nearly 2,000 well times, involving various oil and gas wellheads with complex geology, high pressure, high H2S, and high CO2 content.

This technology uses special tools to install at the wellhead, uses the hydraulic pressure generated by the hydraulic system to send the plug to a predetermined position, opens the plug rubber to seal the high-pressure oil and gas passage, and then performs gate valve operation. In the process of valve replacement, the plug is pressed by hydraulic pressure or a special fixture to ensure stable and reliable operation.

This technology is divided into single-layer or double-layer blockage. It belongs to the technology of valve replacement under pressure without losing hands. It is the technology of valve replacement under pressure specified in the CNPC "Youkan [2010] No. 80" document. The construction process is all in a controlled state, with the advantages of safe and reliable operation, environmental protection, no impact on output, and short construction time. It meets the requirements of "safety, environmental protection, and energy saving" for oil and gas field development, and is especially suitable for high pressure oil and gas wells with high output.


Technical advantages

1) No need to kill well
2) No external power equipment required
3) Replacing the valve is safe, reliable, fast and economical
4) The construction time does not exceed 6 hours, which has little impact on production
5) The main control gate valve and other parts can be replaced under high pressure under pressure
6) Only a small amount of gas is discharged in the tool, which does not pollute the environment, does not harm the gas layer, and does not pollute the formation
7) No impact on crude oil gas well production after construction


Technical parameters of constructable wellhead

Applicable pressure: ≤35MPa (5000Psi)

Iguchi Nominal diameter:φ52mm(图片2)、φ65 mm(图片3)、φ79 mm(图片4)、φ103 mm(图片5


Comprehensive comparison of two methods for replacing gas production wellhead valves

Use conventional replacement methods

Use this device replacement method

Need to kill well

No need to kill well

Need large-scale equipment to cooperate with construction

No need for large-scale equipment to cooperate with construction

Damage the atmosphere

Does not harm the atmosphere

polluted environment

Does not pollute the environment